A massive commercial development in Phoenix, Arizona requiring complex site navigation, subterranean structural engineering, and strict timeline adherence.
During early excavation, we unearthed significant fossil deposits requiring immediate expert evaluation and preservation. Simultaneously, we discovered an undocumented 5-foot subterranean rainwater collection pipe directly interfering with the planned building foundation.
We immediately partnered with local paleontological experts to carefully secure and evaluate the findings without halting adjacent site work. To resolve the infrastructure conflict, our engineering team rapidly redesigned the foundation system to bridge over the 5-foot storm drain. By parallel-tracking these unexpected variables, we protected the site's history and infrastructure without compromising the project schedule or increasing the client's budget.